Execution: 2014-2017.
Client
JOINT VENTURE ASTALDI SpA.- FCC- DELTA AG- AB CONSTRUCT
Construction details
This project involved the construction of 9 stations and 2 parallel tunnels each being 6,223 meters long as well as ancillary structures such as air shafts and electrical substations. The excavation was done with a TBM HK with a closed face shield EPB 660 cm diameter.
The professionals at ITS were involved in the excavation of the tunnel as well as assembly and disassembly of the boring machine.