Execution: 2013 – 2016.

Client

JV FCC-Azvi-Alpine-Straco

Construction details

Tunnels for the new Panaeuropea rail line that will join several central european regions with Turkey. This site is located on the line joining Atel-Micasasa. It is comprised of 2 tunnels having a 120m2 gross area and 2 mine tunnels of 910 linear meters and 325 linear meters, along with two segments of artificial tunnel with a total of 76 linear meters. The excavation material was comprised of very compact and cohesive clays and limestone.

ITS professionals collaborated on the excavation of the tunnel as well as the construction of it’s interior structure for the entirety of the project.